BOMENCO Minerals Engineering Corp. (BMEC) partnered with Giffen to complete the basic engineering package for the process plant at the Terronera Project. Giffen provided multi-discipline engineering and overall plant layout.
The key responsibilities included:
– Collecting and reviewing existing drawings and documents
– General coordination between disciplines and key stakeholders
– Participating in HAZOP/Constructability/ Maintainability Design Session
– Developing overall site plot plan
– Developing process plant general arrangement drawings
– Selection of Mechanical Equipment
– Procurement Support including Technical Bid evaluations
Endeavor Silver Corp. is completing the construction of a greenfield silver and gold mine, Terronera, in Jalisco, Mexico. The Terronera Project is an underground mine with production to start in late 2024.